reflection.js

           blk-online.eu



geprüftes XHTML 1.1 Stufe Doppel-A Symbol, W3C-WAI WCAG 1.0
geprüftes CSS! W3Csites.com gelistet
ICRA gekennzeichnet Site Checker

On Borlach's tracks (2/6)


Bild vom Gestänge I

The field linkage
The connection to the shaft and to the graduation tower













Bild vom Gestänge II

Still today one pumps the raw brine by a tunnel to the graduation tower. The strength generated from the water will transfer with the field linkage.

Today the saltwork-technical arrangements in Bad Kösen are a complex unique in Europe.

 












                   << The waterwheels                                                                         Bore of Borlach >>