
The field linkage
The connection to the shaft and to the graduation tower
Still today one pumps the raw brine by a tunnel to the graduation tower. The strength generated from the water will transfer with the field linkage.
Today the saltwork-technical arrangements in Bad Kösen are a complex unique in Europe.